PCIe Switch Market Size, Share & Trends Analysis Report By Generation (Gen 4, Gen 5, Gen 6 and Above), By Application (AI and Accelerated Computing, Storage and NVMe Fabrics, Enterprise Servers, Embedded and Industrial, Others), By Region, And Segment Forecasts, 2026 - 2035 : Accelerator clusters and flash pooling lift lane counts inside each new server platform
The global PCIe Switch market was valued at USD 1.91 Billion in 2025 and is projected to reach USD 10.34 Billion by 2035, registering a CAGR of 18.4% during the forecast period. The market revenue growth is mainly supported by the fan-out of PCI Express lanes inside accelerated servers, the pooling of NVMe solid state drives behind shared fabrics, and the arrival of Gen 6 silicon running at 64 GT/s per lane. A PCIe switch is a packet switching device that takes the limited number of lanes a host processor provides and divides them among accelerators, network adapters and drives, so that each endpoint keeps a dedicated link at full rate. A fanout switch serves one host. A fabric switch connects several hosts to a shared pool of devices and allows those devices to be assigned to a host under software control. The market covered here includes switch silicon, the switch boards and risers built around it, and the appliances that use those boards to share accelerators and drives across servers. Switching silicon that also carries Compute Express Link traffic is included where the same device handles both protocols.
Revenue in 2025 came mainly from the move of accelerated servers from Gen 4 to Gen 5 devices. Microchip Technology released a Gen 6 fanout family in October 2025 built on a 3 nm process, with up to 160 lanes arranged as 20 ports across ten stacks, and described it as the most energy efficient switch the company had produced. The first Gen 6 fabric switches reached hyperscale qualification in the same year, while the installed platforms being built in volume still ran at 32 GT/s per lane. PCI-SIG released the PCIe 7.0 specification on 11 June 2025 at 128 GT/s per lane, equal to 512 GB/s of bidirectional bandwidth on a sixteen lane link, which set the direction that switch roadmaps have followed since. The practical condition through 2025 was that lane count per accelerator tray rose faster than the number of trays shipped, so switch content per system increased even where platform volumes were flat.
Conditions in 2026 moved Gen 6 switching from qualification into production. Astera Labs reported revenue of USD 392.4 million for the quarter ended June 2026, 104% above the same quarter of 2025, and stated that its Scorpio fabric switches would become its largest product family in the third quarter, one quarter earlier than it had previously guided. Marvell Technology agreed in January 2026 to acquire XConn Technologies, a supplier of hybrid PCIe and CXL switches, for about USD 540 million, and told investors it expected those products to contribute revenue from the second half of its fiscal 2027. The U.S.-Iran conflict is the main external variable for the 2026 and 2027 outlook. In March 2026 the IMF put the share of world oil and seaborne LNG supply cut off by the closure of the Strait of Hormuz at roughly 20%, and the industrial power prices that followed raised the operating cost of AI capacity in Japan, South Korea and Europe. Switch silicon is assembled and tested almost entirely in Asia, so higher bunker and air freight rates also feed into delivered cost. Neither effect has slowed orders, because switch content is a small part of the bill of materials of an accelerated server and is specified by the platform design rather than by the operator's budget.
A PCIe switch is a crossbar of high speed serial lanes with a management and routing block attached, and its cost and power are set almost entirely by the number of lanes. Devices are described by lane count and by how those lanes are grouped into ports, because a port can be configured as one wide link or several narrow ones. Broadcom showed a 144 lane Gen 6 device arranged as 72 ports at SC25 in November 2025, installed in a Dell PowerEdge XE7745 chassis where two switches served eight accelerators together with network adapters and rear panel input and output. Each lane carries its own transmit and receive serialiser and deserialiser. Gen 4 runs at 16 GT/s per lane and Gen 5 at 32 GT/s using non-return-to-zero signalling. Gen 6 moves to 64 GT/s using four level pulse amplitude modulation with forward error correction, which doubles the bandwidth of a lane without doubling its symbol rate. The error correction stage adds a fixed delay to every hop, and PCI-SIG has listed confirmation of the latency and error correction targets as one of the tasks for the 8.0 specification it announced in August 2025. Because total device power is the per-lane figure multiplied by the lane count, high radix parts have moved to leading edge logic nodes sooner than most other data centre components.
Signal conditioning silicon sits alongside the switch and is bought on the same platform decision. At 64 GT/s the usable reach of a printed circuit board trace is a few inches plus a connector, which is shorter than the distance from a host board to an accelerator tray in most chassis. Retimers recover the clock and the data and retransmit a clean signal, while redrivers only boost amplitude and are limited to shorter links. Astera Labs supplies the Aries retimer family and has reported record quarterly revenue for it while its switch family ramps, which shows that the two device classes are additive rather than substitutes. Montage Technology obtained a PCI-SIG integrator listing in August 2026 for a sixteen lane retimer running at 64 GT/s with backward compatibility to the two previous generations. Parade Technologies, Diodes Incorporated and Texas Instruments supply redrivers and multiplexers for the shorter links. A switch port performs retiming as a side effect of receiving and retransmitting a packet, so a design that places a switch near the endpoint can remove a retimer, and a design that uses cables between chassis usually needs both.
Package and board design follow from the lane count. A 144 or 160 lane device needs between 288 and 320 differential pairs to leave the package, which requires a large flip chip ball grid array, low loss laminate and a routing plan that keeps pair to pair skew inside the budget the specification allows. Substrate and assembly work is concentrated with the Asian outsourced assembly and test suppliers, and board fabrication uses the same low loss materials as accelerator baseboards. The switch is rarely sold as a bare component to the end user. It reaches the market as a switch board on a modular platform such as the NVIDIA MGX design, as a host bus adapter style carrier, or inside an appliance that holds accelerators or drives. Server original design manufacturers in Taiwan and China buy most of the silicon on behalf of the brand owners and hyperscalers that specify it.
Lane demand rises faster than system demand because of how accelerated and storage systems are built. A single accelerator needs a sixteen lane link to its host, a high speed network adapter needs another sixteen, and a Gen 6 solid state drive needs four. A tray with eight accelerators and two network adapters therefore consumes more lanes than any current host processor provides, which forces a switch between them. Storage pooling produces the same result at lower unit cost. A flash enclosure holding twenty four drives presents ninety six lanes of endpoint bandwidth that has to be concentrated onto a smaller number of uplinks, and Microchip Technology and Micron Technology demonstrated exactly this arrangement at the 2026 Future of Memory and Storage conference using a Gen 6 fanout switch with Micron 9650 drives. Marvell Technology, XConn Technologies and the hybrid devices they supply extend the same silicon to Compute Express Link traffic, so one switch can carry both protocols where the platform calls for it.
The table below maps the PCIe switching chain from the switch die to the end platform, showing what sits at each level, the function it performs, and which suppliers are active there.
| Level | Technology | Function | Active suppliers | Timing |
|---|---|---|---|---|
| SerDes and controller IP | PAM4 and NRZ serialiser and deserialiser cores at 32 and 64 GT/s, PCIe controller and physical layer IP | Provides the per-lane transceiver and protocol logic the switch die is built from | Broadcom (in-house), Marvell, Synopsys, Cadence Design Systems, Rambus, Alphawave Semi | 64 GT/s cores in production; 128 GT/s cores in development for Gen 7 |
| Switch die and foundry process | High radix crossbar dies on 5 nm and 3 nm logic nodes | Routes packets between ports and holds the management, telemetry and security blocks | TSMC, Samsung Foundry, Broadcom, Microchip Technology, Astera Labs, XConn Technologies | 3 nm switch die announced October 2025; Gen 7 parts scheduled for 2027 |
| Switch device | Fanout switches and multi-host fabric switches from about 24 to 320 lanes | Divides host lanes among endpoints and allows devices to be assigned to hosts under software control | Broadcom PEX, Microchip Switchtec, Astera Labs Scorpio, Marvell, XConn Technologies, Montage Technology | Gen 5 in volume; Gen 6 ramping through 2026 and 2027 |
| Signal conditioning | PCIe retimers and redrivers, active electrical cables | Extends channel reach at 32 and 64 GT/s between host boards, trays and chassis | Astera Labs Aries, Microchip XpressConnect, Montage Technology, Parade Technologies, Diodes Incorporated, Texas Instruments | Gen 6 retimers on PCI-SIG integrator lists from 2026 |
| Package, board and connector | Flip chip ball grid array packages, low loss laminates, MCIO and CDFP style connectors, cable assemblies | Carries hundreds of differential pairs off the die and between boards inside the budget for loss and skew | ASE Technology, Amkor Technology, Amphenol, TE Connectivity, Molex, Panasonic | In volume; connector qualification tracks each generation |
| Switch board and carrier | Modular switch boards for NVIDIA MGX designs, risers, host bus adapter style carriers, storage controllers | Turns the switch device into a serviceable assembly inside a server or storage chassis | Quanta Computer, Wistron, Hon Hai Precision Industry, Inventec, Supermicro, Serial Cables | Gen 6 boards entering production with 2026 and 2027 platforms |
| Fabric appliance | Accelerator pooling appliances, flash enclosures, composable infrastructure chassis | Shares accelerators and drives across several hosts over a switched PCIe fabric | GigaIO Networks, Liqid, H3 Platform, Serial Cables, Supermicro | Gen 5 appliances shipping; Gen 6 designs in qualification |
| End platform | AI training and inference racks, enterprise servers, storage arrays, embedded and industrial controllers | Consumes the switched lanes and sets the lane count that each platform generation requires | NVIDIA, Dell Technologies, Hewlett Packard Enterprise, Supermicro, Micron Technology, hyperscale operators | Rack platforms refreshed on an annual cycle from 2026 |
| Indicator | Latest reading | Period | Direction |
|---|---|---|---|
| Astera Labs revenue guidance | USD 540 million to USD 560 million | Guidance for the quarter ending September 2026 | Rising |
| Astera Labs GAAP gross margin | 73.3% | Quarter ended June 2026 | Broadly stable |
| Broadcom AI semiconductor revenue guidance | USD 21.7 billion | Guidance for the quarter ending November 2026 | Rising |
| Dell Technologies AI server backlog | USD 95 billion | Quarter ended July 2026 | Rising |
| Marvell Technology revenue expectation for acquired switch products | About USD 100 million | Fiscal year 2028, stated January 2026 | Contract coverage building |
| PCI-SIG membership | About 1,000 member companies | June 2025 | Expanding |
| PCIe 8.0 specification target | 256 GT/s per lane, release to members in 2028 | Announced August 2025 | Advancing |
Rising deployment of NVMe storage behind shared fabrics is another major factor supporting market growth. Dell Technologies reported storage revenue of USD 4.9 billion for the quarter ended July 2026, up 26% on the prior year, and the drives inside those systems have moved to Gen 5 and Gen 6 interfaces. Korea's Ministry of Trade, Industry and Energy recorded semiconductor exports of USD 192.4 billion in the first half of 2026, an increase of 162.6%, with memory and storage products accounting for most of the rise. Each drive presents a four lane endpoint, so a single enclosure concentrates more lanes than a host can address directly. Operators that pool flash rather than stranding it inside individual servers therefore buy a switched fabric in front of the drives, and the same fabric allows capacity to be reassigned between hosts without recabling. Furthermore, the training and inference pipelines running on accelerated clusters read data at rates that make local storage the limiting stage, which pushes buyers toward pooled flash served through switches rather than toward more drives per server.
In addition, qualification cycles are long and supply is concentrated. A high radix switch on a leading edge node takes two to three years from specification to volume, and the buyer then runs interoperability testing against every accelerator, adapter and drive it intends to attach. PCI-SIG compliance and integrator listings are a prerequisite for most hyperscale programmes, and the testing cannot begin until silicon from several vendors exists at the same generation. Four suppliers account for most merchant switch shipments, so a schedule slip or an allocation decision at one of them moves platform timing for many buyers at once. Advanced packaging and test capacity for the large substrates these devices need is committed well ahead of delivery, and switch volumes are small next to the accelerator programmes competing for the same capacity.
Demand risk sits in the pace at which accelerator deployments continue and in the cost of running them. Switch roadmaps assume that Gen 6 platforms ramp through 2027 and that Gen 7 parts arrive on schedule in the same window. If accelerator buying slows after 2027, or if operators standardise on rack architectures that carry most traffic on vendor fabrics, the Gen 6 and Gen 7 capacity being reserved in 2026 would arrive against weaker orders and prices would fall faster than the cost curve. Energy cost is the second pressure, since industrial electricity prices in Europe, Japan and South Korea rose through 2026 after the closure of the Strait of Hormuz and raised the operating budget of the halls that buy these systems. These factors substantially limit PCIe Switch market growth over the forecast period.
Storage and NVMe fabrics is the second fastest segment, at a CAGR of 14.0% through 2035 from 23.0% of revenue in 2025. The segment covers switches inside flash enclosures, storage controllers and the pooling appliances that present drives to several hosts. Each drive is a four lane endpoint, so concentration ratios inside an enclosure are high and the switch is the component that sets how many drives a controller can address. Growth here follows the replacement of direct attached flash with pooled capacity, a change that lets operators raise utilisation without adding drives. The segment grows more slowly than accelerated computing because enclosure counts rise with capacity rather than with compute.
Enterprise servers accounted for 22.0% of revenue in 2025 and are set to grow at a CAGR of 8.0% through 2035. Demand comes from mainstream two socket machines that need to attach more adapters and drives than the processor's root complex supports, and from the storage and networking options that server vendors sell with them. Embedded and industrial held 10.0% of revenue in 2025 and is likely to grow at a CAGR of 7.0% through 2035, covering machine vision controllers, medical imaging systems, test equipment and in-vehicle computers, where switch designs stay in production for many years and generation changes are slow. The others segment accounted for 4.0% of revenue in 2025 and should grow at a CAGR of 6.5% through 2035, covering communications equipment, professional audio and video systems, and laboratory instruments that use switched PCIe as a backplane.
Official trade data shows the scale of that assembly base. Taiwan's Ministry of Finance reported information and communication technology exports of USD 251.2 billion in 2025, an increase of 89.5%, and recorded the United States as Taiwan's largest export market for the first time since 2000, which reflects the shipment of finished AI systems built from imported components. China's National Bureau of Statistics reported integrated circuit output of 484.28 billion units in 2025, up 10.9%, and domestic server programmes there use switch and retimer silicon from local suppliers where export rules restrict the alternatives. Montage Technology, based in Shanghai, supplies retimers and active electrical cable devices into those programmes and obtained international compliance listings for its Gen 6 parts during 2026.
Demand outside the two assembly centres is smaller but rising. India's Press Information Bureau reported electronics production of INR 13.11 lakh crore in the 2025-26 financial year, against INR 11.3 lakh crore the year before, and server assembly under the national production incentive schemes now includes AI systems for domestic operators. Japan and South Korea contribute demand through storage systems and industrial computing rather than through hyperscale halls. Korean drive makers also sit on the supply side of this market, since the Gen 5 and Gen 6 drives they ship are the endpoints that switched storage fabrics are built to serve. Singapore and Malaysia host a rising share of regional cloud capacity, and appliance vendors serve those sites from Taiwan.
Government data sets out the pace of construction. The U.S. Census Bureau reported data centre construction spending above USD 75 billion at a seasonally adjusted annual rate in July 2026, up close to 60% on a year earlier. The U.S. Energy Information Administration estimated in May 2026 that data centre servers accounted for about 7% of commercial sector electricity consumption in 2025, a share that rises with each accelerated hall brought into service. Both measures point to the same underlying variable for this market, which is the number of accelerator trays installed rather than the floor area built.
The supply base is concentrated in the region as well. Broadcom holds the longest running merchant switch franchise through its PEX line and supplies retimers at the same generations. Microchip Technology sells the Switchtec family into storage and enterprise systems from its United States operations. Marvell Technology entered merchant switching through acquisition in 2026 and is building the products into its data centre portfolio. Dell Technologies, Hewlett Packard Enterprise and Supermicro specify switch content when they design each platform generation, and the appliance vendors that sell accelerator pooling systems are mostly United States companies. Canada contributes a smaller share, concentrated in Quebec and Alberta where new cloud capacity is being added.
Official statistics show the demand base widening. Eurostat reported that 52.74% of EU enterprises bought paid cloud computing services in 2025, 7.42 percentage points more than in 2023, and that 28.18% of those buyers purchased high performance computing platforms among those services. Public procurement is adding capacity directly: the EuroHPC Joint Undertaking opened its AI Gigafactories call on 30 July 2026 for up to seven facilities across at least seven member states, with expected private investment of more than EUR 20 billion and operations to begin within eighteen months of selection in early 2027. Each of those facilities buys accelerated systems of the same design used by commercial operators, which brings the same switch content per tray. Germany, France, the Netherlands, the Nordic countries and Ireland account for most regional demand, and industrial customers in Germany and Italy support the embedded part of it.
The U.S.-Iran conflict is the main risk attached to these programmes. The IMF cut its 2026 growth forecast for the Middle East to 0.7% in July 2026 after the disruption to Gulf shipping, and construction schedules in the region depend on equipment that arrives by sea through the same routes. Insurance and freight costs on those routes have risen, which lengthens delivery times for racks and for the switch boards inside them. Regional operators have responded by placing orders earlier and by holding larger buffers of critical components. However, energy revenue continues to fund the national AI programmes, so the announced capacity targets have not been reduced.