Panel Level Packaging Market Size, Share & Trends Analysis Report By Packaging Type (Fan-Out Panel Level, Flip Chip Panel Level, Embedded Die), By Application (AI and HPC, Smartphones and Consumer, Automotive, Industrial and Others), By Region, And Segment Forecasts, 2026 - 2035 : Rectangular panel formats move into volume assembly as accelerator packages outgrow round wafer economics
The global Panel Level Packaging market was valued at USD 862.0 Million in 2025 and is projected to reach USD 9,261.9 Million by 2035, registering a CAGR of 26.8% during the forecast period. The market revenue growth is mainly supported by the size of AI accelerator packages, which no longer fit round wafer carriers economically, by the cost per finished package that a rectangular format delivers in consumer and automotive assembly, and by capital spending on advanced packaging capacity at assembly subcontractors, foundries and substrate makers. Panel level packaging builds semiconductor packages on a flat rectangular panel instead of a 300 mm round wafer. Known-good dies are placed face down on a carrier, encapsulated in molding compound or laminated onto a core, and connected by redistribution layers plated across the whole panel before the panel is singulated into individual packages. Panel formats in production or qualification run from 300 by 300 mm and 310 by 310 mm through 510 by 515 mm to 600 by 600 mm. This report covers fan-out, flip chip and embedded die assembly performed on rectangular panels, together with the panel process tooling, carriers and core substrates that these lines consume.
Evidence from 2025 shows a base of consumer and radio frequency work with the first qualification lots for high performance computing. Nepes ran its 600 by 600 mm fan-out line in Korea for power management and radio frequency parts, and Samsung Electro-Mechanics operated a glass core pilot line at Sejong while supplying samples to Apple and Broadcom. According to SEMI, assembly and packaging equipment billings rose 20.8% in 2025, well ahead of the 12% recorded for wafer processing tools, which reflects the shift of capital toward the back end. Amkor Technology broke ground in October 2025 on a Peoria, Arizona campus with more than 750,000 square feet of cleanroom across two phases, and named Apple and NVIDIA as customers. Substrate suppliers moved in the same direction: AT&S, Ibiden and Unimicron all committed capacity to package substrates for AI servers during the year.
Conditions in 2026 have turned on firm commitments from accelerator designers rather than on pilot work. Powertech Technology said in July 2026 that it plans volume production of fan-out panel level packages for AMD by the middle of 2027, and that a single panel carries 45 AI chips against 8 to 9 on a 300 mm wafer for the same design. ASE Technology Holding told investors in August 2026 that its fully automated 310 by 310 mm line will start production in the first quarter of 2027, and that its 13 greenfield and 8 brownfield projects are sized to carry growth into 2028. The U.S.-Iran conflict shapes the 2026-2027 outlook through cost rather than through demand. The IMF stated in March 2026 that the blockade of the Strait of Hormuz had removed access to close to a fifth of world oil and seaborne LNG supply. Panel lines sit almost entirely in Taiwan, South Korea, Japan and China, all of which import the bulk of their energy, and panel plating, molding and cure steps draw heavily on electricity. As a result, higher power tariffs raise the cost floor of panel assembly at the point where its cost advantage over wafer assembly is still being proven to customers.
Area Utilisation, Redistribution Layer Limits and the Accelerator Dies Behind Panel Assembly
The case for the rectangular format is geometric. A 300 mm wafer offers 70,686 square millimetres of usable area, a 510 by 515 mm panel offers 262,650 square millimetres and a 600 by 600 mm panel offers 360,000 square millimetres, which is about 3.7 and 5.1 times the wafer respectively. The gap widens as packages get larger, because a round substrate wastes a ring of partial sites at its edge and that waste grows with the square of the package dimension. Current AI accelerator packages already run past three times the 858 square millimetre lithography reticle field once high bandwidth memory stacks and bridges are placed alongside the compute dies. At that size a wafer carrier yields only a handful of complete units, which is the reason Powertech Technology reports 45 sites per panel against 8 to 9 per wafer. The saving reaches the customer as cost per finished package, since the same molding, plating and redistribution steps are paid for once across a much larger area.
Warpage and die shift are the two problems that decide whether a panel line yields. A panel stack combines silicon at about 2.6 parts per million per degree of thermal expansion, copper at 17 and epoxy molding compound above 20, and each thermal cycle bends the assembly. On a 600 mm panel the same curvature produces four times the edge displacement of a 300 mm wafer, which puts the outer sites out of focus for the exposure tool and out of registration for via placement. Die shift is the related failure: dies move during compression molding, so the vias drawn from a fixed mask land off the copper pads at the panel corners. Deca Technologies addresses this with adaptive patterning, which measures the true position of every die after molding and redraws the via layer for that panel before exposure, and the method has been licensed to assembly houses rather than kept in house. Onto Innovation supplies the matching metrology, including panel lithography that exposes a 250 by 250 mm field in a single shot at line and space below 1.5 micrometres, along with inspection for cracks, chips and through-glass via placement.
Redistribution line and space is where panel work still trails wafer work. Wafer level fan-out reaches 2 micrometre lines routinely and below that in advanced nodes, while panel lines qualify at 5 to 10 micrometres and are working toward 2 micrometres. The constraint is the exposure tool rather than the resist, since no stepper images a 600 mm panel in one field, so the panel is stitched from many exposures and every stitch adds overlay error to the previous one. Equipment suppliers are widening the format in parallel. SCHMID Group shipped the first InfinityLine H+ plating system for formats up to 700 by 700 mm to a United States technology company in March 2026, and SUSS MicroTec reported first quarter 2026 order intake of EUR 149.3 million, up 69.5% on the same quarter of 2025, on demand for coating and lithography tools used in AI chip modules. According to SEMI, assembly and packaging equipment sales are set to reach USD 6.7 billion in 2026 and USD 8.6 billion by 2028, so the tooling layer is expanding faster than the panel packaging revenue it enables.
Carrier choice separates two roadmaps. Organic cores built from ABF laminate are cheap and available today from Ibiden, Shinko Electric Industries, Unimicron and AT&S, but they expand about six times as much as silicon under heat and set the warpage limit for large bodies. Glass cores expand at roughly 3 parts per million per degree, close to silicon, and hold flatness across a large panel, which is why they are the preferred base for packages above three reticles. Absolics has built a glass substrate plant at Covington, Georgia with United States federal support, and Corning, Dai Nippon Printing and Samsung Electro-Mechanics are qualifying their own glass cores. Intel Foundry showed a 78 by 77 mm glass core package at NEPCON Japan in January 2026 that carries two embedded bridges and supports silicon area equal to about twice a reticle. TSMC has taken the more cautious route, running its chip-on-panel-on-substrate pilot on 310 by 310 mm panels at VisEra in Longtan with a second line at its Chiayi advanced packaging site, and it does not expect mass production before 2029. The schedules matter because glass qualification, not panel handling, now sets the date at which the largest accelerator packages can leave wafer format behind.
The table below traces a panel level package from the incoming die through to the system that consumes it, setting out the technology used at each level, the function it performs, the suppliers active there and where each step stands in 2026.
| Level | Technology | Function | Active suppliers | Timing |
|---|---|---|---|---|
| Die supply | Logic and accelerator dies on 300 mm wafers at 3 nm and below, high bandwidth memory stacks, silicon bridges | Provides the known-good dies that are singulated and placed on the panel | TSMC, Samsung Foundry, Intel Foundry, SK hynix, Micron Technology | In volume; die sizes rising with each accelerator generation |
| Carrier and core substrate | ABF organic laminate cores, glass cores with through-glass vias, temporary bonded glass and metal carriers | Holds the dies flat through molding and plating and sets the warpage limit for the finished body | Ibiden, Shinko Electric Industries, Unimicron, Nan Ya PCB, AT&S, Absolics, Samsung Electro-Mechanics, Corning | Organic cores in volume; glass cores in customer qualification through 2027 |
| Panel process tooling | Panel steppers and direct imaging, coater and developer tracks, electroplating and wet lines, panel physical vapour deposition, laser via drilling, warpage metrology | Patterns the redistribution layers and forms the vias across the full panel area | Applied Materials, SUSS MicroTec, Onto Innovation, SCHMID Group, Veeco Instruments, Tokyo Electron, ASMPT | In volume at 510 by 515 mm; 600 by 600 mm and larger platforms shipping from 2026 |
| Panel assembly | Die placement with adaptive patterning, compression molding, panel redistribution build-up, debonding, panel probe and singulation | Converts placed dies and carrier into finished packages at panel scale | ASE Technology Holding, Amkor Technology, Powertech Technology, Nepes, Samsung Electronics, JCET Group, Deca Technologies | Consumer and radio frequency in volume; AI packages from 2027 |
| Package and module | Fan-out panel level packages, panel flip chip ball grid array, embedded die power modules, chip-on-panel-on-substrate | Combines the panel-built structure with memory, bridges and board-level interfaces | TSMC, ASE Technology Holding, Amkor Technology, Powertech Technology, Samsung Electro-Mechanics, Infineon Technologies | Embedded die in volume; chip-on-panel-on-substrate pilot lines running |
| System and end platform | AI accelerator boards and racks, smartphones and wearables, driver assistance controllers, traction inverters, industrial drives | Consumes the package area, cost and thermal headroom that the panel format provides | NVIDIA, AMD, Broadcom, Apple, Qualcomm, Robert Bosch, Tesla | Scaling with AI infrastructure and vehicle electronics across the forecast period |
| Indicator | Latest reading | Period | Direction |
|---|---|---|---|
| ASE Technology Holding capital expenditure plan | USD 10.5 billion, raised by USD 2 billion during the year, with about 70% of equipment spending on leading-edge tools | 2026 plan | Raised |
| Powertech Technology capital expenditure plan | NT$50 billion | 2026 plan | Rising |
| Amkor Technology capital expenditure guidance | USD 2.5 billion to USD 3.0 billion | Full year 2026 | Rising |
| AT&S capital expenditure guidance | EUR 1.0 billion to EUR 1.2 billion, raised from about EUR 400 million | Financial year 2026/27 | Raised sharply |
| SCHMID Group order backlog | EUR 95.0 million, against EUR 54.8 million at the end of June | As of 21 August 2026 | Rising |
| SUSS MicroTec order book | EUR 330.1 million, up 23.7% year on year | End of first quarter 2026 | Rising |
| Ibiden package substrate investment programme | About JPY 500 billion approved, of which JPY 220 billion in the first phase | Financial years 2026 to 2028 | Committed |
Power electronics in electric vehicles is the second major factor behind market growth. According to the IEA Global EV Outlook 2026, about 20 million electric cars were sold worldwide in 2025, an increase of 20% and one quarter of all new car sales, and sales are set to reach 23 million in 2026. Each traction inverter, onboard charger and DC to DC converter uses power semiconductors that are increasingly embedded inside the board rather than soldered onto it, and embedded die modules are produced on panel lines because the process is inherited from printed circuit manufacture. Embedding shortens the loop inductance between the switch and the decoupling capacitance and removes a solder interface from the thermal path, which matters on 800V platforms where switching losses set the cooling budget. Driver assistance controllers add a second automotive demand source, since radar and camera processors in these units are packaged in fan-out formats that panel lines can produce at lower cost than wafer lines at the same design rule.
In addition, the absence of a single panel format fragments the equipment base. TSMC and ASE Technology Holding are building at 310 by 310 mm, several Korean and Chinese lines run at 510 by 515 mm or 600 by 600 mm, and SCHMID Group now supplies plating equipment for formats up to 700 by 700 mm. Tools, carriers, frames and handling automation are specific to a format, so a supplier that qualifies at one size cannot redeploy the capacity if a customer moves to another. This raises the capital cost of entry and lengthens the payback period, and it also limits the second-source options that buyers usually require before committing volume.
Glass core supply is a third constraint, and the schedule has repeatedly moved. Samsung Electro-Mechanics has been supplying samples since 2025 but now expects mass production after 2028, and Intel stopped funding its internal glass core substrate programme in 2025 while continuing to demonstrate the structure. Glass is brittle at the panel edge, cracks during handling and drilling, and requires plating chemistry and inspection that differ from organic lines. Buyers and suppliers should also plan for a scenario in which AI infrastructure spending slows after 2027, because the panel capacity being ordered in 2026 arrives at about that point and would then compete with wafer level capacity that is already depreciated. These factors substantially limit Panel Level Packaging market growth over the forecast period.
AI and HPC is the fastest-growing application, with revenue set to rise at a CAGR of 37.0% through 2035 from a 31.5% share in 2025. Accelerator and switch packages have grown past the point where a round carrier is economic, and this is the only application in which panel assembly is being adopted to gain area rather than to save cost. Substrate demand from the same customers gives a measure of the build: Unimicron and AT&S have both committed multi-year capacity to package substrates for AI servers, and AT&S raised its capital expenditure guidance for the 2026/27 financial year to between EUR 1.0 billion and EUR 1.2 billion for that purpose in June 2026. Qualification lots for accelerator packages began during 2026 and the first production volumes are scheduled for 2027.
Vehicle applications took 17.0% of revenue in 2025 and should grow at a CAGR of 24.0% through 2035. Embedded die power modules, radar transceivers and domain controller processors carry the demand, and each of these moves with electrified powertrain content rather than with vehicle count. According to ACEA, battery-electric cars accounted for 17.4% of EU new car registrations in 2025, compared with 13.6% in 2024, and reached 19.4% in the first quarter of 2026. Qualification to AEC-Q104 module standards limits the number of panel lines able to serve this application, which supports pricing.
Industrial and others held 13.5% of revenue in 2025 and should grow at a CAGR of 20.0% through 2035. Motor drives, photovoltaic inverters, factory sensors and medical instrumentation make up most of the demand, along with aerospace and defense modules that use embedded die construction for shock resistance. Growth here follows industrial capital equipment cycles and the replacement of discrete power assemblies with integrated modules.
Taiwan holds the assembly side of the region. ASE Technology Holding reported second quarter 2026 revenue of NT$191.06 billion, up 26.7% year on year, with assembly and testing revenue of NT$126.15 billion and a 27.3% gross margin in that segment, and it is building its panel capability at 310 by 310 mm. Powertech Technology is the most advanced on fan-out panel work for accelerators and formed a USD 400 million joint venture with Broadcom in July 2026 to add panel capacity in Singapore. TSMC is running chip-on-panel-on-substrate pilot lines through VisEra and its Chiayi site, which pulls panel tooling orders into Taiwan ahead of any production revenue.
South Korea supplies the alternative panel route and most of the glass core work. Nepes has operated 600 by 600 mm fan-out capacity longer than any other company and uses it for power management and radio frequency devices. Samsung Electro-Mechanics runs its glass core pilot at Sejong and has agreed to form a joint venture with a Sumitomo Chemical unit to take the product to production. Japan contributes the substrate base through Ibiden, Shinko Electric Industries and Dai Nippon Printing, and Ibiden approved about JPY 500 billion of investment in high-performance package substrate capacity in February 2026, of which about JPY 220 billion falls in the first phase.
China and India add the volume tail. China's National Bureau of Statistics reported integrated circuit output of 484.28 billion units in 2025, up 10.9%, and Chinese assembly houses have installed panel lines for power management and display driver parts where export controls do not apply. India's Ministry of Electronics and Information Technology reported electronics production of INR 13.11 lakh crore in FY2025-26, against INR 11.3 lakh crore a year earlier, and packaging projects approved under the national semiconductor mission include assembly rather than panel-format lines so far. Energy cost is the region's main exposure over 2026 and 2027, since Japan, South Korea and Taiwan import most of their fuel and panel plating and cure steps are electricity intensive.
Domestic assembly capacity is being built for the first time. Amkor Technology is constructing a campus at Peoria, Arizona alongside TSMC's wafer fabs, with the first building due to complete in mid-2027 and production from early 2028. Demand behind that build shows in trade data: the Bureau of Economic Analysis reported that United States imports of computers rose by USD 101.4 billion in 2025. Applied Materials, Onto Innovation, Veeco Instruments and Deca Technologies supply the deposition, plating, lithography and metrology steps that panel lines require, and Applied Materials reported third quarter fiscal 2026 revenue of USD 9.12 billion, up 25% year on year, with advanced packaging the fastest expanding part of its systems business. Intel Foundry is the other domestic participant, having demonstrated a glass core package with embedded bridges while holding back from a production commitment.
Vehicle electronics drive the region's own consumption. European suppliers embed power dies inside the board for traction inverters and 48V systems, a technique that originated in European printed circuit manufacture and that transfers directly to panel formats. However, the domestic vehicle build is weak: Destatis reported that German automotive production fell 1.7 percent in 2025, which limits near-term volume even as content per vehicle rises. Rising defense budgets add a smaller source of demand for embedded die modules in radar and power conversion equipment, where the sealed construction survives vibration better than soldered assemblies.
The U.S.-Iran conflict is the principal risk to the region's 2026-2027 outlook. The IMF reduced its 2026 growth forecast for the Middle East to 0.7% in July 2026, a cut of 1.2 percentage points, citing the Gulf shipping blockade. War-risk insurance on Gulf hull values has moved from below 1% before the conflict to a range of 1% to 10%, and accelerator hardware is among the most valuable cargo per container that these routes carry. As a result, part of the regional data center schedule is likely to slip into the later years of the forecast period, which pushes the associated package demand back rather than removing it.
